Em Dalieh Inauguration
In order to overcome the increasing overloads at the industrials zone /Hebron, a new 33/11,6.6 KV main substation has been established and inaugurated by the Prime Minister His Excellency Salam Fayyad.
Em Iddaliya main substation is fed with MVA through Al Harayeq feeder and consists of:
  2x10 MVA 33/11,6.6 KV Power Transformer
  5 units of 33 KV switchgear
  8 units of 11 KV switchgear
  1 unit of 11 KV Coupler
Board Of Directors
His Excellency, Prime Minister, Dr. Salam Fayyad  His Excellency, Prime Minister, Dr. Salam Fayyad with Chairman Khaled Osaily during a visit to HEPCo.
M.V. network Rehabilitation Projects
Street Lighting
Sustain of electricity industry in Palestine Eng. A  Sheikh, Participated in the invitation addressed to him by of the Patients Friends Society /Al Ahli Hospital - Hebron, at a ceremony to launch the project of building the capacity of power station (700) kwatts of wind power at 4th/ may/2009.   The presentation was well received by the participants and requested him to hand over a copy of it.

Annual Report 2009

Banner

News

إعلان عن فصل التيار الكهربائي

 

إعلان عن فصل التيار الكهربائي

صادر عن كهرباء الخليل

 

Read more text
 
إعلان طرح عطاء

إعلان  طرح عطاء

2/2010

Read more text
 
استفسار فواتير الكهرباء

 

بامكان اي مشترك في خدمة الكهرباء الاستفسار عن رصيد الذمم المترتبة عليه من خلال الدخول الى خدمة Bills Enquiry

 

Read more text
 
محطات الشحن
 
  دوام محطات الشحن 
Read more text
 
التسديد الالي

 

إعلان هام الى المشتركين الكرام

Read more text

Edison Speech 1920

 

Hebron (Al-Khalel) Electric Power Company

 

HEPCo merged in 2000 as a newly corporatized power utility following a presidential decree for privatizing the energy sector to alleviate the burden off the government and encourage the private sector to participate in developing and investing in this essential sector. In 2005, HEPCo was fully operated by a highly qualified staff using the latest technologies in meter reading and archiving and financial systems, and it succeeded to be one of the fastest growing energy companies present in the Palestinian territories. Our service area covers 92 square kilometers of the largest and fastest growing city in the West Bank. We provide electricity to about 34,000 electric customers throughout Hebron and in Halhul as well as some Since the starting-up of HEPCo in 2005, efforts have been exerted in upgrading the system, rehabilitating the old networks, and replacing most Overhead lines into underground cables in residential areas; we do feel proud that the total costs for the system rehabilitation amounted to NIS M 149 as by end of December 2009, with a total length of single core MV cables installed as part of system reinforcement  that exceeded 180 km route as by end the year 2009 

 

 

 

Hepco in pictures

  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow

Number Of Visitors