Hebron Electricity Develops a new electricity network in the city lights street




Hebron Electricity is extending new 11KV network cables, distribution transformers, and switching air networks to ground networks to serve the citizens and improve the quality and quality of service.

Where the Hebron electric crews are extending an average 11KV ground voltage cables, as well as extending low pressure cables, installing an electric transformer and a ring switch, in the city's lights area, approximately 100 meters long, to provide residential complexes with current, Electrical system in that area, and the estimated cost of this project is about (200) thousand shekels.

In turn, Eng. Abdel Raouf El-Sheikh, Director General of Hebron Electricity, said that efforts are continuing to develop the electrical system in the Hebron Electricity Works area, to maintain continuity of electricity supply, in addition to efforts to develop electricity networks and switch air networks to ground. The Mayor of Hebron Tayseer Abu Sneineh in strengthening and developing the capacity of Hebron Electricity.


We work for you



Public Relations

15/7/2018