Replacement of transformer capacity of "transform station Hussein"




The Hebron electricity crews have replaced, installed, installed and operated a transformer at Al Hussein Transport Station, which feeds the Ein Sara area and the surrounding areas by electric current, in order to meet the expected loads in the winter season and to ensure the continuity of electricity supply especially for home subscribers and senior subscribers. A former adapter exited the service for technical reasons.

In turn, the Director General of Hebron Electricity, Eng. Abdul Raouf Al-Sheikh, stressed that work is under way to develop and improve the quality of the electrical system in the city, through the development and maintenance of main switching stations, and the processing of technical and engineering teams working in the field around the clock with the requirements of public safety, Necessary to sustain those stations and networks, so that these teams can carry out their tasks as required.

He pointed out that this comes within the Hebron Electricity Plan to develop its services by working around the clock with its entire technical and engineering staff to improve the quality of electricity and upgrade its services in various areas of excellence, in order to ensure the provision of better services to subscribers.


We work for you


Public Relations

8/1/2018